A PPENDIX A: S IGNIFICANT I NTERSECTIONS
D PIT DRILL RESULTS - ( INTERCEPTS WITH AU ASSAYS GENERALLY >10GRAM.METRES)
Hole No. 1049RDext Easting Local Grid 7175 Northing Local Grid 2039 Azimuth Local Grid 90 Dip
(°)
Hole Depth
(m)
From
(m)
(m)
To
Interval
(m)*
(g/t)
Au
(g/t)
Ag
-50
361.00 incl. 269.20 296.60 251.20 245.45 264.10 200.00 243.00 180.00 incl. 282.00 289.10 275.70 311.80 267.00 279.00 75.00 251.30 incl. 140.00 130.00 45.00
1574RDext 7046RDext 7054RDext 7063RDext 7065RDext
7073RC 7075RC 7084RC 7090DD 7197RDext 7200RDext 7202RDext 7243RC 7244RC 7247RC
7161 7143 7383 7150 7150
7175 7240 7439 7168 7216 7199 7179 7149 7127 7121
2065 2065 1562 2089 2087
2090 2041 1490 1814 2015 1965 1915 2190 2195 2194
90 90 270 55 75
25 90 270 90 90 90 90 90 75 92
-50 -53 -53 -53 -53
-53 -53 -53 -52 -55 -50 -52 -60 -55 -60
175.70 249.40 271.00 244.55 269.25 112.60 214.95 224.90 0.00 52.00 114.00 205.00 134.00 134.00 91.00 151.90 254.95 239.70 245.60 3.00 100.00 26.00 106.00 27.00 52.00 119.50 120.20 0.00 65.00 24.00
179.05 275.55 275.55 255.45 279.40 136.00 224.70 242.50 13.00 55.00 123.00 226.00 141.00 137.00 97.00 159.90 265.30 251.00 249.70 17.00 116.00 39.00 122.00 47.00 70.00 129.00 125.00 6.00 74.00 37.00
3.35 26.15 4.55 10.90 10.15 23.40 9.75 17.60 13.00 3.00 9.00 21.00 7.00 3.00 6.00 8.00 10.35 11.30 4.10 14.00 16.00 13.00 16.00 20.00 18.00 9.50 4.80 6.00 9.00 13.00
16.70 2.06 3.71 2.58 0.98 1.16 2.64 2.40 1.06 3.88 2.55 1.02 2.08 4.06 2.67 1.67 1.27 1.27 2.69 1.66 2.17 2.03 2.64 1.71 0.78 3.78 6.13 1.53 2.15 2.28
119.2 25.9 78.1 81.8 8.6 2.9 56.5 36.3 6.3 5.7 34.9 25.8 6.1 7.7 9.9 26.8 14.0 32.0 25.4 16.4 30.8 3.6 23.3 8.8 5.9 74.3 132.0 18.8 39.9 9.5
Results awaited for core tail
7250DD 7251RC 7253RC 7254RC
7109 7153 7254 7261
2201 2191 1965 1990
65 70 90 90
-57 -55 -55 -55
S PIT DRILL RESULTS - ( INTERCEPTS WITH AU ASSAYS GENERALLY >10GRAM.METRES)
Hole No. 5224RDext 7087RC Easting Local Grid 6866 6890 Northing Local Grid 1861 1846 Azimuth Local Grid 90 90 Dip
(°)
Hole Depth
(m)
From
(m)
(m)
To
Interval
(m)*
(g/t)
Au
(g/t)
Ag
-55 -55
285.30 200.00
216.50 244.00 35.00
232.50 246.10 38.00
16.00 2.10 3.00
0.99 25.50 3.12
4.0 10.4 9.7
H PIT DRILL RESULTS - ( INTERCEPTS WITH AU ASSAYS GENERALLY >10GRAM.METRES)
Hole No. 7245RC 7246RC 7301RC 7302RC 7305RC 7307RC Easting Local Grid 714 718 676 677 685 643 Northing Local Grid 6048 5400 5999 5999 6153 5550 Azimuth Local Grid 90 90 90 90 90 90 Dip
(°)
Hole Depth
(m)
From
(m)
(m)
To
Interval
(m)*
(g/t)
Au
(g/t)
Ag
-60 -55 -82 -72 -54 -60
200.00 165.00 207.00 213.00 237.00 213.00
168.00 176.00 4.00 146.00 147.00 189.00 153.00 84.00
171.00 179.00 12.00 149.00 151.00 199.00 158.00 90.00
3.00 3.00 8.00 3.00 4.00 10.00 5.00 6.00
3.00 2.40 3.39 5.50 2.92 1.34 2.51 1.79
4.7 8.3 11.1 6.3 9.5 3.4 15.2 63.3
J PROSPECT DRILL RESULTS - ( INTERCEPTS WITH AU ASSAYS GENERALLY >10GRAM.METRES)
Hole No. 7226RC 7233RC Easting Local Grid 5095 5427 Northing Local Grid 1810 1835 Azimuth Local Grid 90 90 Dip
(°)
Hole Depth
(m)
From
(m)
(m)
To
Interval
(m)*
(g/t)
Au
(g/t)
Ag
-55 -55
120.00 123.00
31.00 104.00
37.00 113.00
6.00 9.00
2.31 1.60
17.0 5.6
Q PIT DRILL RESULTS - ( INTERCEPTS WITH AU ASSAYS GENERALLY >10GRAM.METRES)
Hole No. 6437RC 6443RC 6445RC 6449RC 6450RC 6476RC 6481RC Easting Local Grid 6356 6387 6405 6343 6672 6679 6630 Northing Local Grid 5281 4832 4857 4830 4180 4230 4230 Azimuth Local Grid 90 90 90 90 90 90 90 Dip
(°)
Hole Depth
(m)
From
(m)
(m)
To
Interval
(m)*
(g/t)
Au
(g/t)
Ag
-55 -60 -55 -55 -55 -55 -55
80.00 102.00 80.00 109.00 111.00 140.00 110.00
10.00 51.00 27.00 60.00 35.00 59.00 41.00 83.00 4.00
18.00 59.00 31.00 67.00 52.00 63.00 62.00 101.00 14.00
8.00 8.00 4.00 7.00 17.00 4.00 21.00 18.00 10.00
2.03 1.17 1.95 2.61 0.93 2.38 0.88 1.51 1.05
2.7 2.6 94.8 3.7 2.7 10.5 5.7 5.6 5.7
*Intersections may not be true width. RD = Reverse Circulation drillhole with diamond drillhole tail. Italics indicate previously released results.
Kingsgate Consolidated Limited - Quarterly Report for three months ended 31 March 2010 Page 7