CHATREE GOLD MINE, THAILAND
During the quarter, mining accessed the higher grade
areas in “C” North and mining continued in areas of A
Hill. Ore mined was 1,404,485 tonnes at a strip ratio of
2.5:1 (previous quarter 3.9:1). Mine production was
higher in the quarter due to the lack of rainfall. Mining
of the low grade A Stage 2 continued to advance when
access to higher grade areas was not available.
The higher grade section in “C” North was reached in
March. Mining has progressed well during the dry
conditions and it is anticipated that “C” North will be
completed in the next quarter and positively impact
production once again in the fourth quarter.
The process plant treated 1,557,392 tonnes of ore at
an average plant head grade of 0.94 grams per tonne
gold to produce 38,721 ounces of gold. Silver
production was 279,813 ounces. Gold recovery of
84.9% was higher than the prior quarter of 83.5%.
Stockpiled ore at close of quarter was 8,201,620
tonnes at 0.66 grams per tonne containing 173,467
ounces of gold. |
CHATREE NORTH PLANT EXPANSION
The plant has been constructed as a separate 2.7
million tonnes per annum (Mtpa) ore processing plant
located besides the current 2.3 Mtpa Chatree
processing plant. This has resulted in a combined total
‘name-plate’ ore processing capacity of over 5 Mtpa.
The Chatree North Expansion is now operating at
throughput rates of +20% over design. This results in
the combined plants currently operating at an
annualised throughput rate of approximately 6.2 Mtpa.
Construction of Tailings Storage Facility #2 (TSF2)
continued with around 70% of the HDPE liner in place
at quarter end. Installation of the decant tower, power
supply and pipelines continues. TSF2 is planned to be
completed in the September quarter.
REGIONAL EXPLORATION - THAILAND
Exploration drilling, outside of the mining leases at
Chatree, remains on hold until the new Special
Prospecting Licence (SPL) applications and renewals
are approved. |